1 Passage Street Bristol

Overview
  • Size
    106,000 sq ft
  • Role
    Development Manager
  • Project Status
    Planning
  • BREEAM
    Outstanding Targeted
  • NABERS
    5*/5.5* Targeted (Base Build)
  • EPC
    A
  • Wiredscore
    Platinum
  • RESET
    Accredited
Perched along the Floating Harbour, One Passage Street transcends the traditional role of a workspace. It represents a dynamic hub for dialogue, idea exchange, inspiration, and revitalisation—a place where the community can come together to engage and share knowledge.

The project is located on the site of a 1980s office building on Passage Street, with frontage onto Bristol’s Floating Harbour in the heart of the city. We have been granted planning permission to construct a new, best-in-class, super green office building of 106,000 sq ft. Securing this planning approval was challenging due to the building's location in a heritage-rich area adjacent to the floating harbour. The innovative design brilliantly balances historical and modern elements to enhance the public realm.

Our business plan is to develop a Grade A office building with at least 100,000 sq ft of modern office space, prioritizing amenities and communal areas. The development will feature interlaced terracing cascading down its façade, seamlessly integrating with nature, and offering limitless opportunities for creativity. A pocket park will open up the public realm and provide access to the harbour, with a café overlooking the water.

Designed to be carbon neutral, One Passage Street will achieve net-zero carbon emissions, with a commitment to an 11% year-on-year reduction in carbon emissions. This project sets a new standard for sustainable building practices. Key goals include creating a town hall space, making a visual impact for commuters, and establishing a strong connection to local cycling lanes.

One Passage Street is more than just a building; it is a thriving cultural enclave brimming with untapped potential, standing in a class of its own.
A remarkable transformation, opening up the public realm to commuters and ultimately providing Grade A workspace for prospective tenants.
Next
Before
After
Responsibility
The existing building is of notably low quality and insufficient for its intended purpose, impeding any possibility of reusing the current structure. Planning poses a significant challenge, given the heritage-rich area and its proximity to the Floating Harbor. Our goal, from project initiation and throughout, is to ensure that the new build is as sustainable as possible.
Statistics
  • Targets
  • Embodied Carbon (A1-A5)
    638kg CO₂em²
  • Projected Operations Energy
    A
  • BREEAM
    Outstanding
  • NABERS (Base Build)
    5*/5.5*
  • EPC
    A
  • Wiredscore
    Platinum
Learnings
Not being able to repurpose any part of the existing building was devastating for us. Whilst the embodied carbon of the new building will be high, we've prioritised minimising operational carbon emissions and projected energy usage to the best of our ability.
Building efficiency Whilst the aesthetic of the building was key, we started the design process focusing on operational efficiency, striving to achieve future energy consumption of less than 30kWh/m2 (GIA).
Planning process Navigating interactions with the local authority has proven to be a significant challenge, emphasising the importance of working with the right professional team and engaging with the right stakeholders and the right time.
Responsible demolition Are the start of every project, we set out to re-use as much of an existing building as possible. Sadly in the case of 1 Passage Street, the existing building was so badly compromised, the team deemed it unusable. This was due to the slab-to-slab height, configuration, strength and asbestos. As such, we will have to demolish but will ensure the waste is recycled where possible.
Additional Information
Next Place

Explore additional projects focused on ESG principles and the enhancement of existing buildings.

Back to all places
We care about protecting your data



We care about protecting your data

On this website we use cookies and similar technologies to process device information and (anonymised) personal data. Processing serves the integration of content, external services and third-party elements, statistical analysis/measurement, integration of social media and IT security. Depending on the function, data is passed on to and processed by third parties. When integrating social media and interactive elements, data may also be stored by providers outside the jurisdiction of the European Union; despite careful selection, a level of protection equivalent to European data protection standards cannot be guaranteed. All consents are voluntary, not required for the use of our website and can be revoked or individually adjusted at any time via the "Adjust privacy settings" link in the footer.