V7 have started on site at The Buckley Building. Farringdon's finest 90,000 sq ft office.
V7 have started on site at The Buckley Building. Farringdon's finest 90,000 sq ft office.
V7 have started on site at The Buckley Building. Farringdon's finest 90,000 sq ft office.
V7 have started on site at The Buckley Building. Farringdon's finest 90,000 sq ft office.
90 Colmore Row Birmingham
Overview
- Size44,760 sq ft
- RoleDevelopment Management
- Project StatusUnder Construction (PC Spring 2027)
- EPCA
- BREEAMOutstanding Targeted
- WELLPlatinum
Construction is well underway to refurbish and extend 78-90 Colmore Row, working closely with GPAD Architects to retain, refurbish, and celebrate the building’s unique heritage. This best-in-class, sustainable office retrofit is located in Birmingham’s Colmore and Environs Conservation Area.
Our refurbishment will elevate the building’s specifications and energy efficiency, including replacement windows, fortified external walls, and renewable energy sources like PV panels. The Edwardian Neo-Baroque facade, dating back to 1917, will undergo a light refurbishment to restore its former glory, while a new fifth-floor extension, clad in zinc tiles, will preserve the period details and respect its proximity to the Grade I Listed St. Philip’s Cathedral.
Sustainability is a key focus. The project is targeting a whole-building Energy Use Intensity of 115 kWh/m²/year, aligned with UKGBC interim targets for 2025-2030. By retaining the existing structure and materials on-site, we are reducing the need for new resources, resulting in an upfront embodied carbon result of 362 kgCO2e/m². This approach is the equivalent of saving the emissions from 283 return flights from London to Hong Kong. Low-carbon materials like recycled-content aluminium glazing and timber-framed partitions are being specified wherever possible.
Accessibility will be enhanced throughout, including a new corner entrance and reception. Office spaces will be refurbished for greater functionality, with new workspaces and an additional floor added. Wellness spaces, including a landscaped 2700sqft roof terrace and business lounge, will connect occupants to nature while promoting well-being. The building will also target AirRated certification for indoor air quality, ensuring a healthy working environment.
Our plans also include the integration of restaurant, café, and bar facilities across multiple levels, providing vibrant new spaces. The design will feature elements of Birmingham’s rich history, including a colour palette by local artist Stacey Barnfield.
Together, these initiatives ensure that 78-90 Colmore Row will deliver a highly sustainable, people-focused workspace, blending thoughtful restoration with modern functionality in the heart of Birmingham’s evolving cityscape.
Our refurbishment will elevate the building’s specifications and energy efficiency, including replacement windows, fortified external walls, and renewable energy sources like PV panels. The Edwardian Neo-Baroque facade, dating back to 1917, will undergo a light refurbishment to restore its former glory, while a new fifth-floor extension, clad in zinc tiles, will preserve the period details and respect its proximity to the Grade I Listed St. Philip’s Cathedral.
Sustainability is a key focus. The project is targeting a whole-building Energy Use Intensity of 115 kWh/m²/year, aligned with UKGBC interim targets for 2025-2030. By retaining the existing structure and materials on-site, we are reducing the need for new resources, resulting in an upfront embodied carbon result of 362 kgCO2e/m². This approach is the equivalent of saving the emissions from 283 return flights from London to Hong Kong. Low-carbon materials like recycled-content aluminium glazing and timber-framed partitions are being specified wherever possible.
Accessibility will be enhanced throughout, including a new corner entrance and reception. Office spaces will be refurbished for greater functionality, with new workspaces and an additional floor added. Wellness spaces, including a landscaped 2700sqft roof terrace and business lounge, will connect occupants to nature while promoting well-being. The building will also target AirRated certification for indoor air quality, ensuring a healthy working environment.
Our plans also include the integration of restaurant, café, and bar facilities across multiple levels, providing vibrant new spaces. The design will feature elements of Birmingham’s rich history, including a colour palette by local artist Stacey Barnfield.
Together, these initiatives ensure that 78-90 Colmore Row will deliver a highly sustainable, people-focused workspace, blending thoughtful restoration with modern functionality in the heart of Birmingham’s evolving cityscape.
Revitalising the building's facade, and heritage features while adding a 6th floor and roof terrace.
Gallery
Responsibility
By refurbishing and extending the existing building rather than demo/new build it has saved* 13,926,761 cups of tea or 283 return flights from London to Hong Kong or 52,042 pairs of jeans.
Statistics
- Embodied Carbon362kgCO₂e/m²
- Urban Greening Factor .3
- BREEAMOutstanding Targeted
- EPCA
- Projected Operational Energy115kWh/m²
- WELLGold
- Wired ScorePlatinum (Targeted)
Additional Information
- Professional Team
-
Architect
-
Project Manager
-
Quantity Surveyor
-
Sustainability Consultant
-
Structural Engineer
-
Agent
Next Place